The Solution
Migrating mission-critical systems like QMS applications to OCI comes with some strategic advantages. These include:
- Cost optimization: Migrating to OCI reduces infrastructure costs, leading to improved resource utilization and operational efficiency, ultimately driving cost savings for the business.
- Enhanced data security: OCI offers advanced security features that ensure better protection of sensitive data, mitigating potential security risks and enhancing the security posture.
- Improved business agility: OCI enables flexibility and agility in responding to changing business requirements, which allows for faster innovation and adaptation to market dynamics.
- Enhanced user experience: An optimal deployment can enhance the performance of the hosted application, which enables seamless user experience.
These were the key rationales that prompted the migration of the QMS to OCI. In the case of our client, the migration would enable them to achieve better quality outcomes, scale quality processes effortlessly, and deliver higher quality products to the customers.
Birlasoft has led numerous transformation initiatives in the manufacturing sector involving the migration of critical applications. Drawing on this experience, Birlasoft aligned the right teams to lead the QMS migration. Here are the key steps that were involved in the process.
#1. Migration assessment and strategy
Birlasoft teams conducted a detailed assessment to understand migration requirements and objectives. To this end, Birlasoft teams collaborated with the client to understand their current infrastructure, performance bottlenecks, and future scalability needs. This informed the development of a migration strategy that addressed the specific challenges our client was facing and ensured the alignment of the transformation to the client's business goals.
#2. Setting up the Oracle Cloud environment
Based on the application requirements and workloads, Birlasoft collaborated with client to establish Oracle Cloud Infrastructure environments for load testing, development, staging, and production instances. Our teams helped to configure and test each environment meticulously, to meet the specific requirements of the QMS application to ensure an optimal post-migration performance.
#3. Data migration and testing
Our teams helped in the execution of well-prioritized, systematic migration process to transfer all the data and workloads from the on-premise setup to OCI. We conducted exhaustive testing and validation checks to ensure data integrity and consistent functionality of the QMS application in the new environment. These tests included functional testing, performance testing, and security testing.
#4. Post-migration go-live support
Following the migration, Birlasoft facilitated a smooth transition to the OCI production instances of the QMS application. Our teams provided intensive support during the go-live phase to address any issues that were faced by users and conducted ongoing optimization to ensure the application ran efficiently in the new cloud environment.